    I found this presentation just sitting on Utah University's website for a 2011 data center project.

    NewImage

    Found it interesting that this was 4,000 kW facility with 2,400 kW for critical load for a 1.7 PUE in 2011.

    NewImage

    Here are pictures of the data center space during construction.

    I can't recall where I have ever seen Generac generators at a data center site.

    Generators

    Generators to provide power in the event of a power outage

    Brand new facility and their hot/cold aisle containment is not that impressive.  I guess that would explain the 1.7 PUE at full load.  Got to think the PUE is 2.0 during the early phases.

    Finished isle

    Once the racks were installed, airflow zones were created to channel cold air to the racks and contain and vent the hot air from the data center. Power is delivered to each row of racks from an overhead distribution system.

    PrintView Printer Friendly Version

    EmailEmail Article to Friend

    Reader Comments

    There are no comments for this journal entry. To create a new comment, use the form below.

    PostPost a New Comment

    Enter your information below to add a new comment.

    My response is on my own website »
    Author Email (optional):
    Author URL (optional):
    Post:
     
    All HTML will be escaped. Hyperlinks will be created for URLs automatically.